A licensed HVAC pro who works in 63143 will call you back — free.
Service area: The City of Maplewood in St. Louis County, along Manchester Road and Sutton Boulevard from the Sunnen and Maplewood-Manchester MetroLink stops to the Greenwood Historic District.
The city issues building permits, the county issues HVAC permits
Maplewood requires its own building permit for general contracting, but its permit page says electrical, plumbing and mechanical permits must be obtained through St. Louis County. (City of Maplewood)
Six in ten homes are rented
Census estimates count 2,659 of 4,418 occupied homes in Maplewood as rentals, and the city inspects every rental property each year. (Census ACS 2020–2024; City of Maplewood)
1
Drop us a line
Give a name, a phone number and the short version of what's wrong.
2
Expect a single call
One independent, licensed HVAC contractor working in Maplewood follows up. No obligation either way.
Maplewood started around the turn of the 20th century as a bedroom suburb of St. Louis, and its historic residential blocks went up mostly between 1900 and 1910. It covers just 1.56 square miles, with 8,269 residents in 2020 (Wikipedia).
Annual rental inspections and point-of-sale checks
Maplewood leans on inspections more than most suburbs. Rental properties are inspected every year, any change of ownership triggers a housing inspection, and new residents can't move in until an occupancy permit is issued after the property passes (City of Maplewood). With about 60% of homes rented (Census ACS), that cycle reaches most addresses in town.
Landlords: booking furnace service before the yearly inspection is cheaper than a failed item and a re-check.
Sellers: have the system serviced and keep the invoice; buyers often ask for it.
Tenants: report heating or cooling problems to the owner in writing; the owner arranges the repair.
Early-1900s houses and mid-century apartments
Older single-family houses near the historic core share the city with 1960s and 1970s apartment buildings. Expect a basement gas furnace in the houses and electric furnaces or through-wall units in many apartments.
City of Maplewood, ACS 2020–2024 estimates (U.S. Census via Census Reporter)
Measure
Count
Share
Housing units built 1939 or earlier
2,002 of 4,745
42%
Built 1940–1959
950
20%
Built 1960–1979
1,184
25%
Freestanding single-family houses
2,198
46%
Units in buildings with 10–49 units
1,003
21%
Occupied homes heated with utility gas
2,820 of 4,418
64%
Occupied homes heated with electricity
1,583
36%
Why your HVAC permit says St. Louis County
Maplewood's own building permit covers general contracting such as carpentry, accessory structures, partial demolitions, remodeling, signs, fences, patios and decks. Mechanical, electrical and plumbing permits go through St. Louis County instead (City of Maplewood). So a furnace replacement is a county permit, while a remodel that moves the furnace room could need both. A third-party permit directory describes Maplewood as served by St. Louis County code-enforcement contract service (Jaspector); confirm with the county before work begins.
Living with a 1900s house in a humid summer
Houses from the 1900–1910 building boom got central air decades later. If upstairs rooms stay sticky, ask for an airflow and duct check before a bigger condenser.
A coil that ices over often traces back to a clogged filter or low airflow, so shut the AC off, let it thaw, and mention it when you call.
About a third of homes heat with electricity. In those, a heat pump is a straightforward swap worth pricing. Ameren Missouri is the electric utility; see its efficiency programs page for current offers.
Quick answers
Do I go to Maplewood City Hall for a furnace permit?
No. Maplewood handles building permits for things like decks, fences and remodeling, but mechanical permits come from St. Louis County (City of Maplewood). A third-party permit directory lists the county's permit line as (314) 615-5184 (Jaspector).
I'm selling my house. Will the city inspect it?
Yes. Maplewood requires a housing inspection whenever a property changes ownership. A city inspector does a visual check against the Property Maintenance Code, usually in 30 minutes to an hour, and the city posts a checklist to help you prepare (City of Maplewood). If the furnace or AC is unreliable, get it serviced before the inspection.
I just moved in. Do I need anything from the city?
Everyone moving into Maplewood needs an occupancy permit before taking residence, issued only after the property passes inspection. A new permit is $30; call City Hall at 314-645-3600 with questions. (City of Maplewood)
Which license should a contractor hold for Maplewood work?
There is no Missouri-wide HVAC license to check. Because the mechanical permit comes from St. Louis County, the contractor has to be able to pull a county mechanical permit. Ask them to file it in their own name and give you the permit number.
Is the TrueLocalPro request really free?
Yes. We only pass your request to one independent licensed contractor; we don't do the repair. You pay that contractor only if you hire them.
Sources
Facts on this page were checked against these sources on 2026-11-07. Prices and rebates change — confirm current details with the source or your contractor.