Furnace & AC repair in Ladue, MO

A licensed HVAC pro who works in 63124 will call you back — free.

What’s going on

Add your name and a phone number or email.

Service area: Houses inside Ladue city limits in central St. Louis County, along Clayton, Ladue, Warson, Litzsinger and Lindbergh and down the private lanes between them.

Census counts no apartments inside city limits

All 3,557 housing units the ACS estimates for Ladue are detached single-family houses, and about 96% of households own. Median build year: 1955. (Census ACS 2024)

Your condenser spot goes on paper

Ladue’s heating-and-cooling permit form says a site plan is required showing where condensing units, and any structures around them, will sit. (City of Ladue HVAC permit form)

  1. 1

    Say what’s going on

    Leave a name and either a phone number or an email, plus a line such as “second-floor unit won’t cool” or “boiler pilot keeps going out.”

  2. 2

    A single contractor gets in touch

    We hand the request to one independent, licensed HVAC company that takes work in Ladue. You decide whether to book anything.

Ladue was formed in 1936 when three villages, LaDue, Deer Creek and McKnight, merged into one city (Wikipedia). It is still almost entirely large owner-occupied houses, many older than the central air that now cools them, and the city runs its own mechanical permits rather than leaving them to Clayton.

Ladue’s houses by decade, next to the wider 63124 ZIP

More than six in ten Ladue houses were built before 1960, and the 1950s alone account for over a quarter. The 63124 ZIP looks newer and denser because it reaches past the city line: roughly 940 of its units sit in buildings with 50 or more apartments, while the city itself has none.

Year structure built, ACS 2020–2024 five-year estimates
BuiltCity of LadueZIP 63124
1939 or earlier761 (21%)871 (16%)
1940–1949498 (14%)649 (12%)
1950–19591,003 (28%)1,070 (20%)
1960–1969423 (12%)599 (11%)
1970–1999395 (11%)859 (16%)
2000 or later477 (13%)1,342 (25%)
Median year built19551962

A Clayton Road permit desk, with electrical handed to the county

Ladue’s Building Division reviews plans, issues permits, inspects work and licenses contractors and trades. It has adopted the 2021 International Mechanical Code. Electrical permits are the exception: those go to St. Louis County. (City of Ladue Building)

  • Filing. Plumbing and mechanical permits are applied for online through the city portal; the department says it doesn’t take applications by email or fax. (Permit applications)
  • What the form asks. The mechanical application has you tick new, replacement or additional work and count furnaces, AC units, air handlers, pumps, water heaters, boilers, radiant floor, ductwork and gas line. It carries sign-off lines for both the Building Commissioner and the Fire Marshal. (Ladue HVAC permit form)
  • Contractors register first. A company without an active Ladue license has to register with the Building Department, email a current certificate of insurance and pay a $25 annual license fee. (Permit applications)
  • Where. City Hall, 9345 Clayton Road; weekdays 8 to 4, closed noon to 1. (City of Ladue Building)

Big floor plans and more than one system

The city’s permit form counts furnaces and air handlers rather than assuming one of each, which fits the housing. A 1930s or 1950s house that has been added onto often ends up with a basement furnace for the original rooms, a second unit in the attic for a wing or upper floor, and sometimes a boiler or radiant floor kept from an earlier era. When you ask for help, say which zone is misbehaving and where its equipment lives.

  • Gas does the heating. About 2,996 of 3,428 occupied homes, around 87%, burn utility gas for heat; roughly 361 use electricity. (Census ACS 2024)
  • Smell gas? Spire’s Eastern Missouri emergency line, which covers St. Louis County, is 800-887-4173, staffed around the clock. Leave the house first, then call. (Spire)
  • Electric side. Ameren Missouri publishes its HVAC programs online; check there for whatever is currently offered before you sign a replacement quote. (Ameren Missouri)

Before the outdoor unit moves: trustees, trees and flood zones

  • Site plan. Any Ladue mechanical permit needs a drawing showing where condensing units and surrounding structures will be. Moving a condenser to a new side of the house is the kind of change that plan will show. (Ladue HVAC permit form)
  • Subdivision trustees. On building permits, the city wants trustee signatures on plans when a project changes the outside of the home or the lot (Ord. 2153). If your HVAC job comes bundled with an addition or exterior work, budget time for that. (Permit applications)
  • Architectural Review Board. Projects needing a building permit go to the ARB, and other exterior work can be sent there at the Building Commissioner’s discretion. The board meets the first and third Thursdays, with applications due a week ahead. (Ladue ARB)
  • Trees. Clearing five or more trees, or 20% or more of them, triggers a separate committee review, which can matter when a new condenser pad or line set has to go through landscaping. (Permit applications)
  • Floodplain lots. Any construction or land disturbance in a mapped floodplain needs a floodplain development permit, and improvements over 50% of a structure’s value require bringing the whole building into compliance. (Ladue floodplain rules)

If a heating bill is the problem, not the furnace

From November 1 through March 31, Missouri’s Cold Weather Rule bars investor-owned utilities regulated by the state from cutting off heat for nonpayment when temperatures are forecast below freezing. A 2025 state law stretched the forecast window from 24 to 72 hours. (KBIA)

Quick answers

Does a straight furnace or AC replacement in Ladue need a permit?

Yes. The city’s building FAQ says new or replacement mechanical systems require an HVAC permit, and the Building Department lists the mechanical permit among those filed through its online portal. (City of Ladue FAQs; Permit applications)

My new heat pump needs a new circuit. Is that a city permit too?

Not in Ladue. The Building Division says it doesn’t handle electrical permits; those are submitted to and reviewed by St. Louis County. So a job with new wiring can involve two offices: Ladue for the mechanical side, the county for the electrical. (City of Ladue Building)

How far ahead do I book the final inspection?

The city asks for requests by 3:00 PM, 48 hours before the day you want. You or the contractor can call 314-997-6308, use the portal or email the department. (City of Ladue FAQs)

Someone emailed me asking for a Ladue permit fee. Is that real?

Be careful. The city’s permit pages carry a notice about fraudulent permit fee requests. Before paying anything, call the Building Department directly at 314-993-3439. (City of Ladue permit applications)

Is TrueLocalPro the company that comes out?

No. We only connect you, free of charge, and never send technicians of our own. The contractor who calls is an independent business, and any price or schedule is agreed between you and them.

Sources

Facts on this page were checked against these sources on 2026-11-07. Prices and rebates change — confirm current details with the source or your contractor.

  1. U.S. Census ACS 2024 (5-yr) via Census Reporter — year built, heating fuel, tenure and units, Ladue and ZIP 63124
  2. Wikipedia — Ladue, Missouri
  3. City of Ladue — Building Division
  4. City of Ladue — Permit applications
  5. City of Ladue — Heating and Cooling/Mechanical Permit Application (PDF)
  6. City of Ladue — Building FAQs
  7. City of Ladue — Architectural Review Board
  8. City of Ladue — Floodplain regulations
  9. Spire — Contact and emergency numbers
  10. Ameren Missouri — Energy efficiency HVAC programs
  11. KBIA — Utility disconnections prohibited during coldest days (Dec 2025)