The houses are older than the city
Maryland Heights only incorporated in 1985 (Wikipedia), yet the Census median build year for its homes is 1975 and about 8,050 of its 13,100 housing units went up before 1980. (Census ACS 2024)
A licensed HVAC pro who works in 63043 and 63146 will call you back — free.
Service area: Maryland Heights in 63043 and 63146, from the subdivisions off Dorsett and Marine to the apartment communities near Westport and the homes along Fee Fee and Midland creeks.
Maryland Heights only incorporated in 1985 (Wikipedia), yet the Census median build year for its homes is 1975 and about 8,050 of its 13,100 housing units went up before 1980. (Census ACS 2024)
The city requires an occupancy permit at any change of ownership or tenancy, and inspectors check against the 2021 International Property Maintenance Code plus city and county ordinances. (City of Maryland Heights)
Pick what’s happening with the furnace or AC, add your street in Maryland Heights, and leave a phone number or an email, whichever you’d rather be contacted at.
We route it to one independent, licensed HVAC company that serves 63043 and 63146. They contact you directly; you’re free to say no.
Census counts show 5,676 people here in 1980 and 25,407 in 1990 (Wikipedia). The jump lines up with the 1985 incorporation, which put a city government over subdivisions and apartment complexes that had already grown up in unincorporated St. Louis County. The equipment inside those buildings is now on its second or third replacement, and the city that inspects it is much younger than the ductwork.
The 1960s were the busiest decade, followed closely by the ’70s and ’80s; together they produced about seven in ten of today’s homes. Only half of units are detached houses, and roughly 36% are in buildings with five or more apartments, which is why about 43% of households rent.
| Built | Maryland Heights (city) | ZIP 63043 | ZIP 63146 |
|---|---|---|---|
| Before 1960 | 1,270 (10%) | 1,030 (11%) | 1,467 (9%) |
| 1960s | 3,743 (29%) | 3,248 (34%) | 4,833 (31%) |
| 1970s | 3,041 (23%) | 2,215 (23%) | 3,257 (21%) |
| 1980s | 2,623 (20%) | 1,655 (17%) | 2,780 (18%) |
| 1990 or later | 2,431 (19%) | 1,495 (16%) | 3,143 (20%) |
| Median year built | 1975 | 1972 | 1974 |
About 60% of occupied homes in the city heat with piped gas and 38% with electricity, so close to two homes in five run on electric heat. (Census ACS 2024) Mention the fuel when you request help; a stuck heat pump and a gas furnace with a failed igniter call for different parts on the truck.
Because the city inspects at every change of owner or tenant, a furnace that won’t fire is worth fixing before the inspector’s visit, not after. The rules differ by property type. (City of Maryland Heights)
| Property | When | Fee |
|---|---|---|
| Single-family home | New occupant applies within 90 days of a passed inspection, before moving in | $75, up to two re-inspections included |
| Existing apartment unit | Each unit at change of occupancy; whole complex at change of ownership | $60 per unit, two re-inspections included |
| New multi-family | Issued once all construction inspections are done | No charge |
The city runs from Creve Coeur Lake, a 320-acre lake inside a St. Louis County park (Wikipedia), out to the Missouri River, where much of the bottomland is levee-protected but mostly undeveloped. Closer to where people live, Fee Fee, Dorsett and Midland creeks run through residential areas, and the city calls flood insurance a necessity for homes near them. (City of Maryland Heights)
For heating and cooling, that matters in two ways: work in the mapped floodplain needs its own permit with an elevation certificate, and basement furnaces in low-lying homes are the first thing to check after a heavy storm.
The city does. Its Building Division handles building and occupancy permits, and its residential permit list includes certain mechanical, plumbing and electrical work. Applications go through the city’s online portal, with mechanical work marked on the form. Permits Coordinator: (314) 738-2240. (City of Maryland Heights)
The city says the minimum fee due when you apply is typically $50, and larger jobs can owe more before the permit is issued, depending on construction cost. (City of Maryland Heights)
Call the Building Division at 314-291-6550 with the permit number, the type of inspection, the day and time you want, and the name and number of whoever will be at the house. The Government Center at 11911 Dorsett Road is open weekdays 7 a.m. to 5:30 p.m. (City of Maryland Heights)
Maryland Heights has adopted the 2021 International Code Council family of codes, with one exception: its energy code stays at the 2015 edition, as amended. (City of Maryland Heights)
If the lot is in the floodplain, yes: the city requires a Floodplain Development Permit for all work there, with an elevation certificate attached. Ask the Building Division before the unit is moved or a new pad is poured. (City of Maryland Heights)
No. We’re a no-cost referral service. We don’t employ technicians; the licensed company we connect you with sets its own prices, and whether you hire it is your call.
Facts on this page were checked against these sources on 2026-11-07. Prices and rebates change — confirm current details with the source or your contractor.